450 m² restored historical waterfront mansion with Marmara Sea frontage
Located approximately 35 minutes from the Istanbul Camlica toll gates, this exceptional waterfront property is considered one of the most distinguished residences in Hereke, a coastal town renowned for its famous carpets, fresh air, and crystal-clear sea.
The estate is situated on an approximately 2,000 square meter parcel surrounded by mature pine trees, various fruit trees, and olive groves, creating a rare and highly private natural setting.
With 24 meters of direct frontage to the Marmara Sea, the residence itself is an exclusive waterfront mansion of approximately 450 square meters. The mansion was carefully restored while preserving its original identity and architectural character.
It is believed that the property has been used periodically, primarily during summer seasons, since the 1950s when the region was still considered a small coastal village. Ownership of the property has generally changed approximately every twenty years. The property is positioned at the midpoint of the Istanbul-Izmit coastal corridor and offers exceptional sunrise and sunset views over the Marmara Sea.